How long does the install take?

GHE Solar Staff asked 5 years ago
1 Answers
GHE Solar Staff answered 5 years ago

The length of the install of cavity wall insulation entirely depends on the size of the house/area of wall we are installing. For an average detached house it takes approximately 3 hours for an entirely empty cavity and approximately 4 hours for a partial fill cavity. We can give you a better idea on timings for your property when booking the install.